
Sorters
MCK has trained engineers and designers with extensive knowledge in electrical project development.

Technical/Economic Feasibility Study
Avoids unnecessary expenses;
Minimizes risks;
Ensures project safety.
Coordination and Selectivity Study
Increases equipment protection;
Increases the reliability of installations / limiting failure time and overload;
Reduces operational losses;
All electrical projects developed by MCK follow the standards duly regulated by competent bodies so that the projects have a pre-established standard by: NBR 5410, NBR 5419, NBR 8995, etc. This guarantees the client greater guarantees of safety and reliability in their projects that will be executed later.


Design of electrical power distribution and control panels ;
Industrial automation and instrumentation design;
CCM Motor Starting and Control Design;
Electrical projects for safety compliance (NR12);
Electrical projects for electrical adequacy (NR10);


Room lighting
Security lighting project
External/street lighting project
Interior/ambient lighting design
Fire alarm project
IT/CCTV infrastructure project
Electromechanical infrastructure project

